About the Project

Every year, Palmetto Bay embarks on a new drainage project in an effort to mitigate flooding issues throughout the Village, and also improve the surface water management system. To that extent, the Village has adopted a Stormwater Master Plan which lists the priority areas to address flooding conditions. The next scheduled drainage project for 2022 is Sub-basin 61. Below is the project information, including the scope of work, anticipated duration and project cost.

 Scope of Work

The Village has contracted the services of Hartec Construction to install catch basins, manholes, storm sewers, and french drains. The system will connect to existing outfall structures/pipes that discharge to the South Florida Water Management District Cutler Drain Canal (A).

Location

Right-of-way south of SW 155th Terrace, north of SW 160th Street, west of SW 77th Court, and east of SW 79th Avenue.

Project Duration

Project Start Date:  June 21, 2022
Project End Date:  June 2023
Duration:  8 - 12 months

 Total Cost

Project Cost: $ 718,160